Closed-Circuit Television Inspection of Sewers |
The work to be performed will include various on-call cleaning of sanitary sewers comprised of 8, 10, 12, 15 and 18, 21, 24, and 27-inch diameter pipes utilizing hydro jet or mechanical cleaning methods and will be located within streets and other rights-of-way, some of which may be difficult to access.
Closed-Circuit Television Inspection of Sewers
(SMD Last updated on: 3/28/2024)
|
$25,000,000.00 |
Jun-2024 |
La Crescenta/Montrose Residential Franchise |
Trash Collection.
La Crescenta/Montrose Residential Franchise
(EPD Last updated on: 3/14/2024)
|
$51,000.00 |
Jun-2024 |
Bassett/Valinda/South San Jose Hills Residential Franchise |
Trash Collection.
Bassett/Valinda/South San Jose Hills Residential Franchise
(EPD Last updated on: 3/14/2024)
|
$75,000.00 |
Jun-2024 |
South San Gabriel Residential Franchise |
Trash Collection.
South San Gabriel Residential Franchise
(EPD Last updated on: 3/14/2024)
|
$70,000.00 |
Jun-2024 |
Rowland Heights Residential Franchise |
Trash Collection.
Rowland Heights Residential Franchise
(EPD Last updated on: 3/14/2024)
|
$175,000.00 |
Jun-2024 |
Citrus/Charter Oak/Ramona Residential Franchise |
Trash Collection.
Citrus/Charter Oak/Ramona Residential Franchise
(EPD Last updated on: 3/14/2024)
|
$175,000.00 |
Jun-2024 |
On-Call Channel Right of Way Clearing Services |
Channel Clearing.
On-Call Channel Right of Way Clearing Services
(SWMD Last updated on: 3/28/2024)
|
$0.00 |
Jul-2024 |
Whittier Residential Franchise |
Trash Collection.
Whittier Residential Franchise
(EPD Last updated on: 3/14/2024)
|
$300,000.00 |
Jun-2024 |
Landscape and Grounds Maintenance Services (RFSQ) |
Landscape and grounds maintenance services for various areas throughout Los Angeles County.
Landscape and Grounds Maintenance Services (RFSQ)
(RMD Last updated on: 4/11/2024)
|
$0.00 |
May-2024 |
County-Owned Airports Landscape Services |
Landscape and ground maintenance services to be performed at County owned airports.
County-Owned Airports Landscape Services
(AVI Last updated on: 2/29/2024)
|
$980,000.00 |
Jun-2024 |
County Program Management Information System (PMIS) |
IT
County Program Management Information System (PMIS)
(PMDII Last updated on: 3/14/2024)
|
$10,000,000.00 |
Jun-2024 |
On-Call Safe, Clean Water Program Watershed Coordinator Services |
Watershed Coordinator Services for various Watershed Areas.
On-Call Safe, Clean Water Program Watershed Coordinator Services
(SWPD Last updated on: 3/28/2024)
|
$2,300,000.00 |
Jul-2024 |
On-Call Geotechnical and Environmental Drilling Services |
Work to be accomplished consists of the various aspects of drilling related to investigations for geotechnical, environmental, and groundwater purposes.
On-Call Geotechnical and Environmental Drilling Services
(GMED Last updated on: 3/28/2024)
|
$2,000,000.00 |
Apr-2024 |
Advanced Traffic Control Systems Phase III |
IT
Advanced Traffic Control Systems Phase III
(TSM Last updated on: 4/11/2024)
|
$200,000.00 |
Jul-2024 |
Sun Valley Watershed Upper Storm Drain System Phase 3 |
The project proposes to construct 7,500 linear feet of underground storm drain pipe that will convey water to the future Rory M Shaw Wetlands Park. The project includes installation of reinforced concrete pipes (18-inch to 60-inch diameter), including jack and bore work across SCRRA/MetroLink, catch basins, connector pipes, and other drainage elements.
Sun Valley Watershed Upper Storm Drain System Phase 3
()
|
$0.00 |
Feb-2025 |
Santa Anita Headworks Improvements Project |
Headworks modification
Santa Anita Headworks Improvements Project
(SWED)
|
$6,537,000.00 |
Nov-2024 |
Baldwin Lake and Tule Pond Restoration Project |
Baldwin Lake and Tule Pond Restoration Project
(SWPD)
|
$17,300,000.00 |
Oct-2024 |
Marie Canyon Stormwater Disinfection System Upgrade |
Marie Canyon Stormwater Disinfection System Upgrade
()
|
$883,900.00 |
Sep-2024 |
LA River Headwaters Pavilion Project |
Construction of a Tier II Pavilion near the LA River Headwaters, at Alabama Ave and Bassett St in the City of Los Angeles, Canoga Park area. The Pavilion is to be designed per the LARMP Design Guidelines and includes a gateway and various elements (i.e. seating, educational signage, drinking fountains, restrooms, trash receptacles, water quality improvements, etc.).
LA River Headwaters Pavilion Project
(PMDIII)
|
$5,097,795.43 |
Dec-2024 |
Appian Way Pump Station Rehabilitation Project |
Rehabilitate a stormwater pump stations with mechanical, electrical, and building improvements.
Appian Way Pump Station Rehabilitation Project
(PMDIII)
|
$4,200,000.00 |
Jul-2025 |
Naples Island Pump Stations Rehabilitation - Phase II |
Pump Station rehabilitation for mechanical, electrical, and civil upgrades.
Naples Island Pump Stations Rehabilitation - Phase II
(PMDIII)
|
$5,000,000.00 |
Feb-2025 |
Dominguez Pump Station Rehabilitation |
The scope of work of this project includes upgrades to the major mechanical equipment, electrical equipment, and other appurtenances of the pump station. The mechanical scope involves replacement of main pumps, motors, and pipes. The electrical scope involves replacement of motor control center, pump station lighting system, as well as other electrical components. The structural scope involves modification of existing sump pump floor openings, replacement of existing catwalk in sump pump and installation of new catwalk around all five pumps in the sump area.
Dominguez Pump Station Rehabilitation
(PMDIII)
|
$8,500,000.00 |
Dec-2024 |
Rustic Canyon and Rivas Canyon Channels Restoration Project |
Rustic Canyon and Rivas Canyon Channels Restoration Project
(PMDIII)
|
$0.00 |
Mar-2027 |
Bradbury Channel Soffit Repair Phase II |
Storm drain construction and repair.
Bradbury Channel Soffit Repair Phase II
(PMDIII)
|
$1,500,000.00 |
Nov-2026 |
Slauson Avenue over San Gabriel River BNSF & SCRRA & UPRR (53C-0084) |
Seismic Retrofit
Slauson Avenue over San Gabriel River BNSF & SCRRA & UPRR (53C-0084)
()
|
$2,208,955.00 |
Aug-2026 |
Santa Fe Av-Artesia Bl to Del Amo Bl |
Resurf and Reconst
Santa Fe Av-Artesia Bl to Del Amo Bl
()
|
$1,719,045.70 |
Feb-2026 |
Little Tujunga Cyn Rd Over Buck Cyn 53C-0967 |
Bridge Replacement with a single-span, pre-cast, pre-stressed concrete I-Girder structure supported by a pile foundation. Project will also include reconstruction of roadway at both approach ends of the bridge.
Little Tujunga Cyn Rd Over Buck Cyn 53C-0967
(PMDIII)
|
$6,430,966.00 |
Sep-2024 |
Malibu Cyn Rd over Malibu Cyn Ck (53C0620)v |
Malibu Cyn Rd over Malibu Cyn Ck (53C0620)v
(PMDIII)
|
$7,918,450.00 |
Sep-2029 |
Little Tujunga Cyn Rd over Pacoima Ck (53C0969) |
Bridge Replacement with a single-span, pre-cast, pre-stressed concrete girder structure supported by a pile foundation. Project will also include reconstruction of roadway at both approach ends of the bridge.
Little Tujunga Cyn Rd over Pacoima Ck (53C0969)
(PMDIII)
|
$5,220,000.00 |
Jun-2026 |
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0518) |
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0518)
(PMDIII)
|
$4,268,000.00 |
Apr-2027 |
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0519) |
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0519)
(PMDIII)
|
$4,068,000.00 |
Mar-2026 |
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C-0517) |
Construct Bridge
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C-0517)
()
|
$7,000,000.00 |
Jul-2028 |
Soledad Cyn Rd over LACMTA & SCRRA Tracks BR NO 53C-0555 |
Bridge Replacement
Soledad Cyn Rd over LACMTA & SCRRA Tracks BR NO 53C-0555
()
|
$2,000,000.00 |
Nov-2027 |
Peck Road over San Gabriel River BR NO 53C-0617L & R |
Rehabilitation
Peck Road over San Gabriel River BR NO 53C-0617L & R
(PMDIII)
|
$5,500,000.00 |
Dec-2026 |
Wilshire Boulevard et al |
Resurface & Reconstruct
Wilshire Boulevard et al
(PMDIII)
|
$4,677,050.15 |
Dec-2024 |
Circle Trail over Topanga Cyn Creek 53C-0970 |
Circle Trail over Topanga Cyn Creek 53C-0970
(PMDIII)
|
$0.00 |
Mar-2026 |
Soledad Cyn Rd over Santa Clara River 53C-0488 |
Bridge replacement
Soledad Cyn Rd over Santa Clara River 53C-0488
()
|
$6,000,000.00 |
Jan-2028 |
The Old Rd over Castaic Creek 53C-1403 |
Bridge Seismic Retrofit - Construction of catcher blocks, concrete in-fill walls, and micropiles, and the performance of other appurtenant work.
The Old Rd over Castaic Creek 53C-1403
(PMDIII)
|
$3,479,072.00 |
Nov-2024 |
Compton Bl et al - East Rancho Dominguez |
Resurface
Compton Bl et al - East Rancho Dominguez
()
|
$6,500,000.00 |
Sep-2024 |
The Old Rd over Santa Clara River and SPT CO Bridge et al |
Road Widening
The Old Rd over Santa Clara River and SPT CO Bridge et al
(PMDIII)
|
$20,837,712.85 |
Nov-2024 |
Compton Blvd over Compton Creek 53C-0925 |
Compton Blvd over Compton Creek 53C-0925
(PMDIII)
|
$7,639,100.00 |
Dec-2025 |
Wilmington Ave over Compton Creek 53C-0907 |
Wilmington Ave over Compton Creek 53C-0907
(PMDIII)
|
$6,500,000.00 |
Aug-2025 |
Windsor Hills - Southridge Avenue et al |
Windsor Hills - Southridge Avenue et al
(PMDIII)
|
$3,109,000.00 |
Jul-2025 |
Norwalk Bl et al |
Reconstruct and Resurface
Norwalk Bl et al
()
|
$8,088,378.40 |
Oct-2025 |
East Los Angeles - Whiteside Street et al Ph I |
Reconstruct 2.3 mi of locals and a storm drain.
East Los Angeles - Whiteside Street et al Ph I
()
|
$5,709,360.60 |
Aug-2024 |
Bridge Preventive Maintenance Program - Group 11 Cities |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 11 Cities
(DES)
|
$2,616,605.20 |
Aug-2025 |
Bridge Preventive Maintenance Program - Group 15 City |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 15 City
()
|
$2,600,000.00 |
Mar-2027 |
Metro Gold Line Eastside Access Phase II |
Streetscape Improvements
Metro Gold Line Eastside Access Phase II
(PMDIII)
|
$5,701,267.00 |
May-2026 |
Bridge Preventive Maintenance Program - Group 17 City |
Bridge Preventive Maintenance Program - Group 17 City
(PMDIII)
|
$933,124.40 |
Dec-2025 |
Mulberry Dr and Painter Av Intersection Improvements |
Intersection improvements
Mulberry Dr and Painter Av Intersection Improvements
()
|
$2,739,000.00 |
Jul-2025 |
Metro Gold Line Eastside Access Phase II Calvary Cemetery Pedestrian Path |
Walking Path
Metro Gold Line Eastside Access Phase II Calvary Cemetery Pedestrian Path
(PMDIII)
|
$9,848,233.10 |
Nov-2024 |
Washington Bl et al |
Road resurfacing, sidewalk, driveway and curb ramp upgrades. Median patterned hardscaping.
Washington Bl et al
(PMDIII)
|
$3,568,400.00 |
Apr-2025 |
Bridge Preventive Maintenance Program - Group 22 County |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 22 County
()
|
$172,490.00 |
Nov-2026 |
Lake Hughes Rd at 235ft S-o MM2.47 (2015 Oct Storm) |
Lake Hughes Rd at 235ft S-o MM2.47 (2015 Oct Storm)
()
|
$1,900,840.00 |
Jun-2025 |
Bridge Preventive Maintenance Program - Group 24 City |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 24 City
()
|
$2,192,872.60 |
Feb-2027 |
Bridge Preventive Maintenance Program - Group 25 Cities |
Bridge Preventive Maintenance Program - Group 25 Cities
(PMDIII)
|
$2,233,246.25 |
Aug-2025 |
Puente Creek Bikeway |
Puente Creek Bikeway
(PMDIII)
|
$7,371,504.93 |
Jun-2024 |
South Whittier Community Bikeway Access Improvements |
South Whittier Community Bikeway Access Improvements
()
|
$0.00 |
Feb-2025 |
Michillinda Avenue Intersection Improvements Project |
Intersection Improvement.
Michillinda Avenue Intersection Improvements Project
()
|
$1,935,356.00 |
Jul-2024 |
Decker School Rd @ MM 1-04 Slope Repair Off-Sys (2019FEBSTM1) |
Decker School Rd @ MM 1-04 Slope Repair Off-Sys (2019FEBSTM1)
()
|
$1,097,432.00 |
Sep-2024 |
Bridge Preventive Maintenance Program - Group 12 and 13 |
Bridge Preventive Maintenance Program - Group 12 and 13
(PMDIII)
|
$2,178,479.40 |
Feb-2025 |
Bridge Preventive Maintenance Program - Groups 18 & 19 |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Groups 18 & 19
(PMDIII)
|
$1,256,015.35 |
Aug-2025 |
Westmont/West Athens Pedestrian Improvements (MM4601.04) |
Westmont/West Athens Pedestrian Improvements (MM4601.04)
(PMDIII)
|
$13,368,000.00 |
Dec-2025 |
East Los Angeles Monument Improvements |
Remove and replace existing monuments, landscaping upgrades and art installation.
East Los Angeles Monument Improvements
(PMDIII)
|
$1,046,062.77 |
May-2024 |
Big Pines Hwy et al -Guardrail Replacement On-System (2020 Bobcat Fire) |
Replacement of guardrails damaged by the 2020 Bobcat Fire and the performance of other appurtenant work. Work must include the MASH Sequentially Kinking Terminal TL-3 manufactured by Road Systems.
Big Pines Hwy et al -Guardrail Replacement On-System (2020 Bobcat Fire)
(PMDIII)
|
$307,290.00 |
Jul-2024 |
Bridge Preventive Maintenance Program - Groups 21 and 23 and 26 |
Bridge Preventive Maintenance Program - Groups 21 and 23 and 26
(PMDIII)
|
$3,737,254.20 |
Apr-2025 |
Carmenita Rd and Imperial Hwy Intersection Improvements (MM5509_04) |
Carmenita Rd and Imperial Hwy Intersection Improvements (MM5509_04)
(PMDIII)
|
$988,485.00 |
Jul-2024 |
Las Tunas Dr at Orange Grove Av-Culvert Replacement |
Culvert Replacement
Las Tunas Dr at Orange Grove Av-Culvert Replacement
()
|
$360,000.00 |
Apr-2025 |
Bridge Preventive Maintenance Program - Groups 14 & 20 |
Bridge Preventive Maintenance Program - Groups 14 & 20
(PMDIII)
|
$1,848,106.60 |
Apr-2025 |
West Puente Valley - Temple Avenue et al |
Resurface 4.2 mi of majors
West Puente Valley - Temple Avenue et al
()
|
$3,168,255.29 |
Sep-2024 |
Avocado Heights San Jose Hills - Valley Boulevard |
Avocado Heights San Jose Hills - Valley Boulevard
(PMDIII)
|
$7,987,506.00 |
Aug-2024 |
Hacienda Heights - Hacienda Boulevard Phase I |
Cold-mill and overlay with a layer of asphalt rubberized asphalt concrete. Sidewalk reconstruction, guardrail upgrade, tree removals and tree planting..
Hacienda Heights - Hacienda Boulevard Phase I
(PMDIII)
|
$4,448,000.00 |
Nov-2024 |
Brea Canyon Cutoff Road, et al. |
Brea Canyon Cutoff Road, et al.
()
|
$3,500,000.00 |
Jul-2025 |
Hacienda Heights Community - Leticia Drive et al Phase II |
Reconstruct 5.8 mi of locals
Hacienda Heights Community - Leticia Drive et al Phase II
(PMDIII)
|
$7,135,000.00 |
Apr-2025 |
Rosewood - 139th Street, et al. Phase II |
Reconstruct 4.15 mi of locals
Rosewood - 139th Street, et al. Phase II
(DES)
|
$9,008,000.00 |
Sep-2024 |
Chatsworth - Lake Manor Drive et al |
Chatsworth - Lake Manor Drive et al
()
|
$1,228,000.00 |
Sep-2024 |
East Los Angeles - City Terrace Drive |
East Los Angeles - City Terrace Drive
(PMDIII)
|
$24,956,468.00 |
Sep-2026 |
RMDJOC6751 Parkway Concrete Maintenance, Maintenance District 1 |
Concrete Maintenance
RMDJOC6751 Parkway Concrete Maintenance, Maintenance District 1
(RMD)
|
$1,500,000.00 |
Aug-2024 |
RMDJOC6752 Parkway Concrete Maintenance, Maintenance District 1 |
Concrete Maintenance
RMDJOC6752 Parkway Concrete Maintenance, Maintenance District 1
(RMD)
|
$1,500,000.00 |
Aug-2024 |
RMDJOC6753 Parkway Concrete Maintenance, Maintenance District 1 |
Concrete Maintenance
RMDJOC6753 Parkway Concrete Maintenance, Maintenance District 1
(RMD)
|
$1,500,000.00 |
Aug-2024 |
RMDJOC6754 Parkway Concrete Maintenance, Maintenance District 1 |
Concrete Maintenance
RMDJOC6754 Parkway Concrete Maintenance, Maintenance District 1
(RMD)
|
$0.00 |
Aug-2024 |
RMDJOC6757 Parkway Concrete Maintenance, Maintenance District 3 |
Concrete Maintenance
RMDJOC6757 Parkway Concrete Maintenance, Maintenance District 3
(RMD)
|
$4,000,000.00 |
Aug-2024 |
RMDJOC6764 Parkway Concrete Maintenance, Maintenance District 5 |
Concrete Maintenance
RMDJOC6764 Parkway Concrete Maintenance, Maintenance District 5
(RMD)
|
$750,000.00 |
Aug-2024 |
RMDJOC6768 Guardrail Replacement, South Los Angeles County |
Guardrail Replacement
RMDJOC6768 Guardrail Replacement, South Los Angeles County
(BRCD)
|
$1,000,000.00 |
Aug-2024 |
RMDJOC6769 Pavement Preservation (Seal Coats), North Los Angeles County |
Pavement Preservation (Seal C
RMDJOC6769 Pavement Preservation (Seal Coats), North Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6775 Pavement Preservation (Seal Coats), South Los Angeles County |
Pavement Preservation (Seal Coats)
RMDJOC6775 Pavement Preservation (Seal Coats), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6776 Pavement Preservation (Seal Coats), South Los Angeles County |
Pavement Preservation (Seal Coats)
RMDJOC6776 Pavement Preservation (Seal Coats), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6777 Pavement Preservation (Seal Coats), South Los Angeles County |
Pavement Preservation (Seal Coats)
RMDJOC6777 Pavement Preservation (Seal Coats), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6778 Pavement Preservation (Resurfacing), South Los Angeles County |
Pavemt. Preserv. (Resurfacing)
RMDJOC6778 Pavement Preservation (Resurfacing), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6779 Pavement Preservation (Resurfacing), South Los Angeles County |
Pavemt. Preserv. (Resurfacing)
RMDJOC6779 Pavement Preservation (Resurfacing), South Los Angeles County
(BRCD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6780 Pavement Preservation (Resurfacing), South Los Angeles County |
Pavemt. Preserv. (Resurfacing)
RMDJOC6780 Pavement Preservation (Resurfacing), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6782 Pavement Reconstruction (Sustainable), South Los Angeles County |
Pavement Reconstruction
RMDJOC6782 Pavement Reconstruction (Sustainable), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
RMDJOC6783 Pavement Reconstruction (Sustainable), South Los Angeles County |
Pavement Reconstruction
RMDJOC6783 Pavement Reconstruction (Sustainable), South Los Angeles County
(RMD)
|
$5,250,000.00 |
Aug-2024 |
Viewridge Road Stormwater Improvements Project |
Construction of a stormwater capture system that includes a diversion structure, storm drain system, biofiltration units, manholes, pretreatment vaults, catch basins, automatic retractable screens, connector pipe screens, slide gate, landscaping, electrical, paving, grading, and the performance of other appurtenant work.
Viewridge Road Stormwater Improvements Project
()
|
$7,611,000.00 |
Nov-2024 |
Wagon Road Low Flow Diversion Project |
Low Flow Diversion
Wagon Road Low Flow Diversion Project
(SWQD)
|
$1,255,000.00 |
Jun-2026 |
Marina del Rey Back Basins Stormwater Improvements Project |
Construct 400 linear feet of 10-inch HDPE pipe, 3 diversion manholes and 4 stormwater filtration Best Management Practices at various existing storm drain catch basins within the unincorporated area of Marina del Rey.
Marina del Rey Back Basins Stormwater Improvements Project
(PMDIII)
|
$1,496,010.00 |
Jul-2024 |
Altadena - Lake Avenue at Mendocino Street |
Altadena - Lake Avenue at Mendocino Street
(PMDIII)
|
$1,145,000.00 |
Jul-2025 |
San Francisquito Canyon Road and Lake Hughes Road Signage Project |
San Francisquito Canyon Road and Lake Hughes Road Signage Project
(PMDIII)
|
$692,900.00 |
Sep-2024 |
Bouquet Canyon Rd at Vasquez Canyon Rd |
Bouquet Canyon Rd at Vasquez Canyon Rd
()
|
$436,623.00 |
Oct-2024 |
Bouquet Canyon Road - 638 Feet North of MM 16.43 to 1145 Feet North of MM 3.52 |
Bouquet Canyon Road - 638 Feet North of MM 16.43 to 1145 Feet North of MM 3.52
(PMDIII)
|
$506,950.00 |
Jun-2024 |
San Gabriel Valley Traffic Signal Safety Project Group II |
Upgrade Traffic Signals
San Gabriel Valley Traffic Signal Safety Project Group II
()
|
$2,020,840.00 |
Oct-2024 |
Azusa - Barranca Av at Baseline Rd |
Azusa - Barranca Av at Baseline Rd
()
|
$441,900.25 |
Sep-2024 |
Rancho Dominguez - Del Amo Blvd at Wilmington Ave |
Rancho Dominguez - Del Amo Blvd at Wilmington Ave
()
|
$653,220.00 |
Aug-2025 |
Florence-Graham - Holmes Ave at Randolph Street |
Florence-Graham - Holmes Ave at Randolph Street
()
|
$0.00 |
Jun-2025 |
Willowbrook - Willowbrook Ave at 119th St |
Willowbrook - Willowbrook Ave at 119th St
(PMDIII)
|
$0.00 |
Oct-2024 |
Alameda Street Traffic Signal Safety Project HSIP Cycle 9 |
Alameda Street Traffic Signal Safety Project HSIP Cycle 9
()
|
$1,877,579.15 |
Jun-2025 |
Avalon Boulevard HSIP Cycle 9 |
Avalon Boulevard HSIP Cycle 9
()
|
$750,618.75 |
Feb-2025 |
Willowbrook - Willowbrook Ave at 124th Street |
Willowbrook - Willowbrook Ave at 124th Street
(PMDIII)
|
$0.00 |
Oct-2024 |
Willowbrook - Willowbrook Ave at 130th Street |
Willowbrook - Willowbrook Ave at 130th Street
(PMDIII)
|
$0.00 |
Oct-2024 |
Willowbrook - Willowbrook Ave at El Segundo Boulevard |
Willowbrook - Willowbrook Ave at El Segundo Boulevard
(PMDIII)
|
$0.00 |
Oct-2024 |
Willowbrook - Willowbrook Ave at Stockwell Street |
Willowbrook - Willowbrook Ave at Stockwell Street
(PMDIII)
|
$0.00 |
Oct-2024 |
Del Sur - Avenue E at Sierra Highway |
Road Realignment
Del Sur - Avenue E at Sierra Highway
()
|
$2,500,000.00 |
Sep-2025 |
Santa Monica Mountains and Malibu - Kanan Tunnel project and Mulholland Highway project |
Santa Monica Mountains and Malibu - Kanan Tunnel project and Mulholland Highway project
(PMDIII)
|
$1,652,000.00 |
Aug-2024 |
Bus Stop Improvements - Antelope Valley and Santa Clarita |
Bus Stop Improvements - Antelope Valley and Santa Clarita
(PMDIII)
|
$1,670,000.00 |
Oct-2024 |
Advertising Bus Shelter Replacement Project (Phase 1) |
Fabricate and install 40 bus shelters.
Advertising Bus Shelter Replacement Project (Phase 1)
()
|
$2,310,000.00 |
Jul-2024 |
Alameda Street TSSP - Nadeau Street to Auto Drive South |
Project is for installation and modification of traffic signals and the performance of other appurtenant work.
Alameda Street TSSP - Nadeau Street to Auto Drive South
()
|
$1,791,410.75 |
Feb-2025 |
Lower Azusa Rd-Los Angeles St TSSP - Rosemead Blvd to Maine Ave |
Lower Azusa Rd-Los Angeles St TSSP - Rosemead Blvd to Maine Ave
(PMDIII)
|
$1,658,770.25 |
Oct-2024 |
Valley Blvd-Holt Ave TSSP - Lemon Ave to Mills Ave |
Valley Blvd-Holt Ave TSSP - Lemon Ave to Mills Ave
(PMDIII)
|
$1,279,000.00 |
Nov-2024 |
Myrtle Avenue-Peck Road TSSP - Huntington Drive to Clark Street |
Myrtle Avenue-Peck Road TSSP - Huntington Drive to Clark Street
()
|
$670,300.00 |
Nov-2024 |
Ramona Boulevard-Badillo Street-Covina Boulevard TSSP - Santa Anita Ave to the 57 Fwy and BSP - Tyler Ave to Grand Av |
Ramona Boulevard-Badillo Street-Covina Boulevard TSSP - Santa Anita Ave to the 57 Fwy and BSP - Tyler Ave to Grand Av
(PMDIII)
|
$1,728,000.00 |
May-2025 |
Avalon Boulevard TSSP - 126th Street to Sepulveda Boulevard |
Avalon Boulevard TSSP - 126th Street to Sepulveda Boulevard
(PMDIII)
|
$5,270,198.50 |
Dec-2024 |
Imperial Highway TSSP - Sundale Avenue to Budlong Avenue |
Imperial Highway TSSP - Sundale Avenue to Budlong Avenue
(PMDIII)
|
$1,072,450.00 |
Sep-2024 |
Rosecrans Av (East) TSSP - Ocean Gate Avenue to Vermont Avenue |
Rosecrans Av (East) TSSP - Ocean Gate Avenue to Vermont Avenue
()
|
$1,521,700.00 |
Dec-2024 |
Slauson Avenue TSSP - Santa Fe Avenue to Chapin Road |
Slauson Avenue TSSP - Santa Fe Avenue to Chapin Road
()
|
$2,497,090.00 |
Jan-2025 |
Woodruff Avenue TSSP - Firestone Boulevard to Willow Street |
Project is for installation and modification of traffic signals and the performance of other appurtenant work.
Woodruff Avenue TSSP - Firestone Boulevard to Willow Street
(PMDIII)
|
$2,630,058.75 |
Sep-2024 |
Redondo Beach Boulevard TSSP - Artesia Boulevard to Vermont Avenue |
Redondo Beach Boulevard TSSP - Artesia Boulevard to Vermont Avenue
(PMDIII)
|
$767,800.00 |
Feb-2025 |
Rosecrans Av (West) TSSP - Highland Avenue to Ocean Gate Avenue |
Rosecrans Av (West) TSSP - Highland Avenue to Ocean Gate Avenue
(PMDIII)
|
$611,600.00 |
Jan-2025 |
Foothill Boulevard TSSP - Lowell Avenue to Crown Avenue |
Foothill Boulevard TSSP - Lowell Avenue to Crown Avenue
(PMDIII)
|
$1,910,880.00 |
Oct-2024 |
South Bay ITS - Arterial System Detection |
South Bay ITS - Arterial System Detection
(PMDIII)
|
$2,000,000.00 |
Nov-2024 |
Gateway Cities Fiber Optic Communications and CCTV Camera Project |
Fiber optic and CCTV
Gateway Cities Fiber Optic Communications and CCTV Camera Project
(TSM)
|
$2,400,000.00 |
May-2025 |
Florence Avenue @ Graham Avenue et al |
Florence Avenue @ Graham Avenue et al
()
|
$530,000.00 |
Sep-2025 |
Peck Road TSSP - Hemlock Street to Workman Mill Road |
Peck Road TSSP - Hemlock Street to Workman Mill Road
()
|
$1,601,181.50 |
Sep-2024 |
Arrow Highway TSSP - Rennell Avenue to Claremont Boulevard - Mills Avenue |
Arrow Highway TSSP - Rennell Avenue to Claremont Boulevard - Mills Avenue
()
|
$1,400,000.00 |
Jan-2025 |
Las Tunas Drive-Live Oak Avenue-Arrow Highway TSSP - Baldwin Avenue to Valley Center Avenue |
Las Tunas Drive-Live Oak Avenue-Arrow Highway TSSP - Baldwin Avenue to Valley Center Avenue
()
|
$1,900,000.00 |
Oct-2024 |
Norwalk Boulevard-San Antonio Drive-Pioneer Boulevard TSSP - Beverly Boulevard to Carson Street |
Norwalk Boulevard-San Antonio Drive-Pioneer Boulevard TSSP - Beverly Boulevard to Carson Street
(PMDIII)
|
$2,250,716.00 |
Dec-2024 |
Whittier Boulevard TSSP - Indiana Street to Paramount Boulevard |
Whittier Boulevard TSSP - Indiana Street to Paramount Boulevard
(PMDIII)
|
$3,531,982.00 |
Mar-2026 |
Manhattan Beach Boulevard TSSP - Manhattan Avenue to Van Ness Avenue |
Manhattan Beach Boulevard TSSP - Manhattan Avenue to Van Ness Avenue
(PMDIII)
|
$1,210,403.75 |
Dec-2024 |
Slauson Avenue - Mulberry Drive TSSP - Paramount Boulevard to Scott Avenue |
Slauson Avenue - Mulberry Drive TSSP - Paramount Boulevard to Scott Avenue
()
|
$1,229,910.00 |
Sep-2024 |
Intelligent Transportation System Improvements - East Los Angeles Fiber 2013 CFP |
Intelligent Transportation System Improvements - East Los Angeles Fiber 2013 CFP
()
|
$1,260,000.00 |
Oct-2024 |
Big Tujunga Reservoir Restoration Project |
Sediment removal
Big Tujunga Reservoir Restoration Project
(SWED)
|
$60,000,000.00 |
Apr-2025 |
Lower Busch Tank Improvement |
Water Tank Replacement
Lower Busch Tank Improvement
()
|
$2,562,455.00 |
Jun-2025 |
District 29 Creek Crossings Repairs |
Repair corrosion damage
District 29 Creek Crossings Repairs
(PMDIII)
|
$1,300,000.00 |
May-2027 |
New Sweetwater Mesa Water Tank Project |
Construct new 1MG water tank at 3293 Sweetwater Mesa Road, Malibu, CA 90265
New Sweetwater Mesa Water Tank Project
()
|
$3,019,700.00 |
Sep-2026 |
PCH 8-inch Waterline Improvements (Zumirez Drive to Escondido Beach Road) |
Replace 9,850 ft. of water main
PCH 8-inch Waterline Improvements (Zumirez Drive to Escondido Beach Road)
()
|
$6,600,000.00 |
Feb-2025 |
Coastline Drive 12-Inch Waterline Improvements |
Replace 2,000 ft. of waterline
Coastline Drive 12-Inch Waterline Improvements
(PMDIII)
|
$2,501,200.00 |
Jun-2024 |
Upper Encinal Tank Improvement |
Construct 225,000 gallon tank and demolish 70,000 gallon tank.
Upper Encinal Tank Improvement
(PMDIII)
|
$4,300,000.00 |
Jan-2025 |
Carbon Canyon Road Waterline Improvements |
Construct Water Line
Carbon Canyon Road Waterline Improvements
(PMDIII)
|
$4,400,000.00 |
Jul-2026 |
Encinal Canyon Road Emergency Interconnection |
Installation of 7,200 feet of watermain.
Encinal Canyon Road Emergency Interconnection
()
|
$5,600,000.00 |
Aug-2025 |
Trancas Creek Crossing Permanent Waterline (Phase II) |
Install approximately 400 LF of 18-inch steel waterline, remove approximately 420 LF of High-Density Polyethylene (HDPE) waterline, and abandon approximately 370 LF of HDPE waterline.
Trancas Creek Crossing Permanent Waterline (Phase II)
(PMDIII)
|
$800,000.00 |
Apr-2025 |
Lower Encinal Pump Station Improvements |
Upgrade Pump Station
Lower Encinal Pump Station Improvements
(WWD)
|
$2,543,000.00 |
Jan-2025 |
Malibu Road Water Line Improvements |
Malibu Road Water Line Improvements
(PMDIII)
|
$0.00 |
Oct-2027 |
Grand View Drive 8-Inch Waterline |
Construct Waterline
Grand View Drive 8-Inch Waterline
(PMDIII)
|
$1,300,000.00 |
Aug-2027 |
Sweetwater Mesa Water Line Improvements |
Construct Water Main, Pressure Relief Station, and Pump Station
Sweetwater Mesa Water Line Improvements
()
|
$5,100,000.00 |
Jun-2028 |
Topanga Beach Security Fence |
Topanga Beach Security Fence
(PMDIII)
|
$220,000.00 |
Sep-2026 |
PCH Water Supply Resilience Project |
PCH Water Supply Resilience Project
(PMDIII)
|
$0.00 |
Jul-2028 |
Avenue J-12 and 50th Street West Site Improvements Well 4-91 |
Replace well 4-22 with 4-91
Avenue J-12 and 50th Street West Site Improvements Well 4-91
(PMDIII)
|
$3,575,279.00 |
Sep-2024 |
Rock Creek Water Main Improvement Project |
Rock Creek Water Main Improvement Project
(PMDIII)
|
$500,000.00 |
Nov-2027 |