Smith River Stream Bank Stabilization Decision Notice

Aug 9, 2022 2:27 PM

The Smith River Camp Baker Streambank Stabilization Project is proposed to be constructed to repair stream bank erosion and damage at Camp Baker and directly downstream. The damage has been caused by natural river dynamics, hydrologic impacts of the lower boat ramp, and traffic from lower boat ramp users and livestock walking on the affected bank just downstream of the lower ramp. 

 