Boundary Channel Drive at I-395 interchange improvements in Arlington County

Lat/Long: 38.870075, -77.046587

    Overview

    Boundary Channel Drive at I-395 interchange improvements design display

    This project is upgrading the Boundary Channel Drive at I-395 interchange and making bicycle and pedestrian improvements in the area.

    The project includes reducing underutilized roadway capacity on Boundary Channel Drive in order to construct a 12-foot-wide westbound shared-use path and an eight-foot-wide eastbound sidewalk. The half-mile shared-use path will create a new link between the Mount Vernon Trail to the Pentagon and Long Bridge Park by tying into the existing path that parallels the southbound George Washington Memorial Parkway ramp to southbound I-395.

    Other project improvements include:

    • Installing roundabouts on Boundary Channel Drive just west and east of I-395
    • Reconfiguring the ramps between I-395, Boundary Channel Drive and Long Bridge Drive
    • Adding crosswalks along Boundary Channel Drive and Long Bridge Drive

    groundbreaking ceremony was held in September 2022.

    ground breaking ceremony

    Benefits

    This project will improve safety and traffic flow, and enhance accessibility and connectivity for bicyclists and pedestrians in one of the region's busiest corridors.

    Major milestones

    • Virtual design public hearing: November 2020
    • Begin design-build procurement: February 2021
    • Award design-build contract: June 2021
    • Begin construction: September 2022
    • Groundbreaking ceremony: September 2022
    • Final completion: Late Spring 2024

    Other Related Documents

    Estimated start date: September 2022

    Estimated completion date: Late Spring 2024

    Estimated cost of the project: $19.6 million

    Estimated costs:
    Preliminary engineering: $509,000
    Right of way acquisition and utility relocation: $550,000
    Construction: $18.6 million
    Total: $19.6 million

    Funding source: This project is financed with state (including Revenue Sharing), Arlington County and Northern Virginia Transportation Authority funding.

    ground breaking ceremony
    Boundary Channel Drive at I-395 interchange improvements design display

     

    Last updated: April 5, 2024