We're preserving the bridge that goes over the Tillamook River by:
Removing the old paint and rust.
Replacing worn out or damaged bolts and rivets as needed.
Applying a new coat of paint.
This work is important for the health and longevity of the bridge.
Schedule
Design: 2021-2024
Construction: 2025
Location
OR 131
|
Milepoint 7.5
Cost and Funding
Design and Construction: $1.7 Million
Pedestrians, including those with disabilities, will have access through or around
the work zone.