Project-Details







I-105 Paving from Willamette River to I-5

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Eugene, Lane)


​​​​​​​​​​​​​​​​​We're repaving to preserve the road and give you a smoother ride.​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

None at this time.

Construction Impacts

None at this time. We plan to resume work in June. You can expect:

  • Work Sunday through Thrusday, 7 p.m. to 5:30 a.m.
  • Nighttime single lane closures as needed.
  • Crews in both eastbound and westbound lanes.
  • Construction noise and delays. 

Construction Activities

We're removing and replacing the current driving surface, making repairs and installing a new protective surface to preserve the bridge over Coburg and Country Club Roads.

Visit TripCheck ​for the most current traffic information. ​​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. ​

Details

About

​We're repaving I-105 between Delta Highway and Pacific Highway (I-5) including several on- and off-ramps within the project area. We're also replacing the surface on seven bridge decks.

The current pavement and bridge decks are in poor condition. To preserve them and improve overall safety, we're removing and replacing the surfaces. This will help extend the useful life for these roads and bridges and give you a smoother ride. 

Project work will include:

  • Repaving I-105 and the identified I-105 and I-5 on- and off-ramps.
  • Removing and replacing seven bridge deck surfaces.
  • Adding rumble strips between milepost 2.25 and 4.
  • Adding reflective strips to guardrails for improved visibility.

​Schedule

Design: 2022
Construction: 2023-2024

Location

I-105 |

​Milepost .91 to 4 and multiple connection ramps

Cost and Funding

​$11.2 million

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer
Shane Prohaska
Email
shane.prohaska@odot.oregon.gov
Phone
541-744-8080

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045
Public Comment Form
Submit a commentfor project

Get Project Alerts

Sign up for the newsletter!

Last Updated

5/3/2024 2:47 PM

Project Number

21538