In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Name |
Address |
Sent |
Reply Received |
TANYA AYRES |
COMBE MARTIN COMMUNITY CENTRE
CHURCH STREET
COMBE MARTIN
ILFRACOMBE
DEVON
EX34 0LQ |
|
15/12/2022 |
Owner/Occupier |
1 Whitegates
Combe Martin
Ilfracombe
Devon
EX34 0BB |
18/11/2022 |
|
Owner/Occupier |
2 Whitegates
Combe Martin
Ilfracombe
Devon
EX34 0BB |
18/11/2022 |
|
Owner/Occupier |
Butterflies Woodlands
Combe Martin
Ilfracombe
Devon
EX34 0AS |
18/11/2022 |
|
Owner/Occupier |
Castle Heights Woodlands
Combe Martin
Ilfracombe
Devon
EX34 0AS |
18/11/2022 |
|
Owner/Occupier |
Rosemary Woodlands
Combe Martin
Ilfracombe
Devon
EX34 0AS |
18/11/2022 |
|
Owner/Occupier |
The Grove Woodlands
Combe Martin
Ilfracombe
Devon
EX34 0AS |
18/11/2022 |
|
Owner/Occupier |
White Gates Hotel Woodlands
Combe Martin
Ilfracombe
Devon
EX34 0AT |
18/11/2022 |
|
Constraints List |
Advert Control Area Area of Special Advert Control |
Planning Officer Area: North Team |
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk |
Landscape Character is: 4C Coastal Slopes and Combes with Settlement |
Article 4 Area: Combe Martin and Berrynarbor |
Chivenor Safeguard Zone Consultation Structure or works exceeding 91.4m |
Within:Exmoor Heaths, SAC 10KM Buffer if agricultural development consider need for AQIA |
Within:Exmoor and Quantock Oakwoods, SAC 10KM Buffer if agricultural development consider need for AQIA |
Within:, SSSI 500M Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 5KM Buffer in North Devon (Exmoor NP),consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 10 or more houses outside existing settlements/urban areas.,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 500 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
Within Adopted AONB (ST09 & ST14) |
Within Adopted Coast and Estuary Zone |
Within adopted Development Boundary: Combe Martin Development Boundary ST07 |
Within 100m of Adopted Heritage Coast |
Within Adopted Unesco Biosphere Transition (ST14) |
USRN: 27505211 Road Class:Q Ownership: Private |