Updated April 23, 2025
There will be lane closures on Pleasant Grove Boulevard between Foothills Boulevard and Galilee Road due to night work through Friday, April 25, from 9 p.m. to 6 a.m. Signals will be flashing red from 10 p.m. to 5 a.m. at the Foothills Boulevard intersection and there will be traffic control in place.
Please stay alert, allow extra time, and travel with care through the work zone.
The schedule is subject to change due to inclement weather or other unforeseen conditions.
Construction of the Pleasant Grove Boulevard Widening Project is progressing with most underground work now complete.
Because roadway paving uses temperature-sensitive materials, resurfacing will resume in early spring when temperatures are warmer.
The project is on track and anticipated to be completed in summer 2025.
Please stay alert, allow extra time, and travel with care through the work zone.
In the work zone, the speed limit will be reduced for the duration of the project. Please slow down and travel with care. Bicyclists are encouraged to use the sidewalk or the nearby trail.
Please note the schedule is subject to change due to equipment, materials, weather, and other unexpected conditions.