Final reporting was completed in 2022 for the DivisionConnects study. Please look under the pink “Study Reports/Documents” tab to view documents from Phases 1 and 2 of the study. Design of the Division bus rapid transit line will continue through a preliminary engineering process, led by Spokane Transit Authority (STA). Go to STA’s Division BRT project site to learn more about the bus rapid transit project, schedule, and ways to participate. 

DIVISION CONNECTS PROJECT SPONSORS

Translate (Traducir/Перевод) »