Magnum Gas Storage, LLC; Notice of Motion To Partially Vacate 
Certificate Authorization or in the Alternative, Motion To Amend 
Certificate Authorization

    Take notice that on March 4, 2020, Magnum Gas Storage, LLC 
(Magnum), 3165 E Millrock Dr., #330, Holladay, Utah 84121, filed in 
Docket No. CP20-77-000, a Motion requesting to partially vacate the 
certificate authorization for certain facilities approved in the 
captioned dockets, or in the alternative to amend the certificate 
authorization. Magnum proposes to delete two natural gas storage 
caverns, one brine pond and related facilities from the current 
authorization as they are no longer needed for the authorized storage 
service. Magnum states that no facilities authorized in the above 
captioned proceedings have been constructed, or placed into service, 
all as more fully set forth in the application, which is on file with 
the Commission and open to public inspection. The filing may also be 
viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to John 
Alvarado, CFO/COO, Magnum Development LLC, 3165 E Millrock Dr., #330, 
Holladay, Utah 84121, telephone: (801) 748-5567, email: 
[email protected] or J. Gordon Pennington, Attorney at Law, 
Georgetown Place, 1101 30th Street NW, Suite 500, Washington, DC 20007, 
phone: (202) 625-4330, email: [email protected].
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made with the Commission and must provide a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new Natural Gas Act 
section 3 or section 7 proceeding.\1\ Persons desiring to become a 
party to a certificate proceeding are to intervene in a timely manner. 
If seeking to intervene out-of-time, the movant is required to show 
good cause why the time limitation should be waived, and should provide 
justification by reference to factors set forth in Rule 214(d)(1) of 
the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at 
50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on March 27, 2020.

    Dated: March 12, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-05566 Filed 3-17-20; 8:45 am]