NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-483; 50-275; 50-323; 50-321; 50-366; 50-348; 50-364; 
50-247; 50-286; 50-333; 50-369; 50-370; 50-245; 50-336; 50-423; 50-338; 
50-339; 50-266; 50-301; 50-244; 50-335; 50-389; 50-443; 50-400; 50-498; 
50-499; 50-289; 50-250; 50-251; NRC-2020-0110]


Issuance of Multiple Exemptions in Response to COVID-19 Public 
Health Emergency

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemptions; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) issued 21 
exemptions in response to requests from 13 licensees. The exemptions 
allow these licensees temporary relief from certain requirements under 
NRC regulations. The exemptions are in response to the COVID-19 public 
health emergency (PHE). The NRC is issuing a single notice to announce 
the issuance of the exemptions.

DATES: The 21 exemptions were issued between June 2, 2020, and June 30, 
2020.

ADDRESSES: Please refer to Docket ID NRC-2020-0110 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0110. Address 
questions about NRC docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions, contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room reference staff at 1-800-397-4209, 301-415-4737, or by 
email to [email protected].
    For the convenience of the reader, instructions about obtaining 
materials referenced in this document are provided in the 
``Availability of Documents'' section.

FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-7422, email: [email protected].

SUPPLEMENTARY INFORMATION:

I. Introduction

    The NRC issued 21 exemptions to 13 licensees in response to 
requests dated between April 29, 2020, and June 19, 2020. These 
exemptions temporarily allow the licensees to deviate from certain 
requirements (as cited below) of various parts of chapter I of title 10 
of the Code of Federal Regulations (10 CFR).
    The exemption from certain requirements of 10 CFR 50.71(e)(4) for 
Pacific Gas and Electric Company (for the Diablo Canyon Nuclear Power 
Plant, Units 1 and 2) allows the licensee to submit revisions of the 
Updated Final Safety Analysis Report (UFSAR) and Technical 
Specification (TS) Bases later than it would otherwise be required to 
by the regulations. The exemption from the requirements of 10 CFR 
50.71(e)(4) results in benefit to the public health and safety by not 
conflicting with practices recommended by the Centers for Disease 
Control and Prevention (CDC) to limit the spread of COVID-19 and does 
not result in any decrease in safety. The exemption provides only 
temporary relief from the applicable regulation and the licensee has 
made good faith efforts to comply with the regulation.
    The exemptions from certain requirements of 10 CFR 50.48(b) and 10 
CFR part 50, appendix R, section III.I, for Southern Nuclear Operating 
Company (for Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, and 
Joseph M. Farley Nuclear Plant, Units 1 and 2), allow the licensee 
temporary exemption from the quarterly fire brigade drills requirement 
and the annual live firefighting training requirement in 10 CFR 
50.48(b) and 10 CFR part 50, appendix R, section III.I. These 
exemptions allow the licensee to temporarily defer implementation of 
requirements that would otherwise cause the licensee to take actions 
that could conflict with practices recommended by the CDC to limit the 
spread of COVID-19. This licensee has committed to implement a station-
specific process to manage affected personnel while ensuring the safety 
of its workers in maintaining performance capability.
    The exemptions from certain requirements of 10 CFR part 73 for 
Union Electric Company (for Callaway Plant, Unit No. 1); Pacific Gas 
and Electric Company (for the Diablo Canyon Nuclear Power Plant, Units 
1

[[Page 43883]]

and 2); Southern Nuclear Operating Company (for the Edwin I. Hatch 
Nuclear Power Plant, Unit Nos. 1 and 2, and the Joseph M. Farley 
Nuclear Power Plant, Units 1 and 2); Entergy Nuclear Operations, Inc. 
(for the Indian Point Nuclear Generating Unit Nos. 2 and 3); Exelon 
Generation Company, LLC (for the James A. FitzPatrick Nuclear Power 
Plant, R. E. Ginna Nuclear Power Plant, and the Three Mile Island 
Nuclear Station, Unit 1); Duke Energy Carolinas, LLC (for the McGuire 
Nuclear Station, Units 1 and 2); Dominion Energy Nuclear Connecticut, 
Inc. (for the Millstone Power Station, Units Nos. 1, 2, and 3); 
Virginia Electric and Power Company (for the North Anna Power Station, 
Unit Nos. 1 and 2); NextEra Energy Point Beach, LLC (for the Point 
Beach Nuclear Plant, Units 1 and 2); Florida Power & Light Company (for 
the St. Lucie Plant, Units Nos. 1 and 2, and Turkey Point Nuclear 
Generating Unit Nos. 3 and 4); NextEra Energy Seabrook, LLC (for the 
Seabrook Station, Unit No. 1); Duke Energy Progress, LLC (for the 
Shearon Harris Nuclear Power Plant, Unit 1); STP Nuclear Operating 
Company (for the South Texas Project, Units 1 and 2), allow these 
licensees temporary exemptions from certain requirements of 10 CFR part 
73, appendix B, ``General Criteria for Security Personnel,'' section 
VI. The exemptions will help to ensure that these regulatory 
requirements do not unduly limit licensee flexibility in using 
personnel resources in a manner that most effectively manages the 
impacts of the COVID-19 PHE on maintaining the safe and secure 
operation of these facilities and the implementation of a licensee's 
NRC-approved security plans, protective strategy, and implementing 
procedures. These licensees have committed to certain security measures 
to ensure response readiness and for their security personnel to 
maintain performance capability.
    The NRC is providing compiled tables of exemptions using a single 
Federal Register notice for COVID-19-related exemptions instead of 
issuing individual Federal Register notices for each exemption. The 
compiled tables below provide transparency regarding the number of 
exemptions the NRC is issuing. Additionally, the NRC publishes tables 
of approved regulatory actions related to the COVID-19 PHE on its 
public website at https://www.nrc.gov/about-nrc/covid-19/reactors/licensing-actions.html.

II. Availability of Documents

    The tables below provide the facility name, docket number, document 
title, and ADAMS accession number for each exemption issued. Additional 
details on each exemption issued, including the exemption request 
submitted by the respective licensee and the NRC's decision, are 
provided in each exemption approval listed on the tables below. For 
additional directions on accessing information in ADAMS, see the 
ADDRESSES section of this document.

------------------------------------------------------------------------
                 Document title                     ADAMS accession No.
------------------------------------------------------------------------
              Callaway Plant, Unit No. 1--Docket No. 50-483
------------------------------------------------------------------------
Callaway Plant, Unit 1--Security Training         ML20156A191 (non-
 Exemption Request due to COVID-19, dated June     public, withheld
 4, 2020.                                          under 10 CFR 2.390).
Callaway, Unit 1--Supplement to Security          ML20169A542.
 Training Exemption Request Due to COVID-19,
 dated June 17, 2020.
Callaway Plant, Unit 1--Exemption Request from    ML20169A446.
 Certain Requirement of 10 CFR PART 73, Appendix
 B, ``General Criteria for Security Personnel,''
 Section VI (EPID L-2020-LLE-0097 [COVID-19]),
 dated June 23, 2020.
------------------------------------------------------------------------
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Docket Nos. 50-275 and
                                 50-323
------------------------------------------------------------------------
Diablo Canyon Units 1 and 2--Request for One-     ML20135H021.
 Time Exemption from 10 CFR 50.71(e)(4) UFSAR
 and TS Bases Update Requirements, dated May 14,
 2020.
Diablo Canyon Nuclear Power Plant, Units 1 and    ML20140A356.
 2--Approval of Exemption from the Requirements
 of 10 CFR 50.71(e)(4) (EPID L-2020-LLE-0059
 [COVID-19]), dated June 2, 2020.
------------------------------------------------------------------------
Diablo Canyon Nuclear Power Plant, Units 1 and 2--Docket Nos. 50-275 and
                                 50-323
------------------------------------------------------------------------
Diablo Canyon Power Plant, Units 1 and 2--        ML20169A354 (non-
 Request for Exemption from Specific               public, withheld
 Requirements of 10 CFR 73, Force-on-Force         under 10 CFR 2.390).
 Requirements, dated June 17, 2020.
Diablo Canyon Nuclear Power Plant, Units 1 and    ML20170A319.
 2--Exemption Request from Certain Requirements
 of 10 CFR Part 73, Appendix B, ``General
 Criteria for Security Personnel,'' Section VI
 (EPID L-2020-LLE-0101 [COVID-19]), dated June
 24, 2020.
------------------------------------------------------------------------
  Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, and Joseph M. Farley
Nuclear Plant, Units 1 and 2--Docket Nos. 50-321, 50-366, 50-348, and 50-
                                   364
------------------------------------------------------------------------
SNC Requests a Temporary Exemption from the       ML20143A253.
 Quarterly Fire Brigade Drills and Annual Live
 Fire Fighting Training Requirements of the
 Regulation, dated May 22, 2020.
SNC Requests a Temporary Exemption from the       ML20149K302.
 Quarterly Fire Brigade Drills and Annual Live
 Fire Fighting Training Requirements of the
 Regulation, dated May 27, 2020.
Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2-- ML20147A147.
 Exemption Request from Requirements of 10 CFR
 50.48(b), Section III.I. of Appendix R Related
 to Quarterly Fire Brigade Drills (EPID L-2020-
 LLE-0070), dated June 2, 2020.
Edwin I. Hatch Nuclear Plant, Units 1 and 2--     ML20147A133.
 Approval of Exemption Request from Requirements
 of 10 CFR 50.48(b), Section III.I of Appendix R
 Related to Annual Live Fire Fighting Training
 (EPID L-2020-LLE-0071), dated June 2, 2020.
Joseph M. Farley Nuclear Plant, Units 1 and 2--   ML20147A171.
 Approval of Exemption from Requirements of 10
 CFR 50.48 Related to Quarterly Fire Brigade
 Drills (EPID L-2020-LLE-0074 [COVID-19]), dated
 June 2, 2020.
Joseph M. Farley Nuclear Plant, Units 1 and 2--   ML20147A465.
 Approval of Exemption from Requirements of 10
 CFR 50.48 Related to Annual Live Fire Fighting
 Training (EPID L-2020-LLE-0075 [COVID-19]),
 dated June 2, 2020.
------------------------------------------------------------------------

[[Page 43884]]

 
  Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2, and Joseph M. Farley
Nuclear Plant, Units 1 and 2--Docket Nos. 50-321, 50-366, 50-348, and 50-
                                   364
------------------------------------------------------------------------
Edwin I. Hatch Nuclear Plant, Units 1 and 2       ML20171A485 (non-
 (HNP) and Joseph M. Farley Nuclear Plant, Units   public, withheld
 1 and 2 (FNP) Request Temporary Exemptions from   under 10 CFR 2.390).
 the identified Security Training
 Requalification Requirement, dated June 19,
 2020.
Joseph M. Farley Nuclear Plant, Units 1 and 2,    ML20175A121.
 and Edwin I. Hatch Nuclear Plant, Units 1 and
 2--Exemption Request from Certain Requirements
 of 10 CFR Part 73, Appendix B, ``General
 Criteria for Security Personnel,'' Section VI,
 dated June 29, 2020.
------------------------------------------------------------------------
  Indian Point Nuclear Generating Unit Nos. 2 and 3--Docket Nos. 50-247
                               and 50-286
------------------------------------------------------------------------
Indian Point Nuclear Generating Unit Nos. 2 and   ML20125A327.
 3--(04/29/2020) Email from R. Gaston to R.
 Guzman, Exemption Request from Requirements of
 10 CFR Part 73, Appendix B, Section VI,
 Subsection C.3.(l)(1), dated April 29, 2020.
Indian Point; Exemption from Annual Force-on-     ML20148M389.
 Force (FoF) Exercise, dated May 27, 2020.
Indian Point Nuclear Generating Unit Nos. 2 and   ML20156A057.
 3--Exemption Request from Certain Requirements
 of 10 CFR Part 73, Appendix B, ``General
 Criteria for Security Personnel,'' Section VI
 (EPID L-2020-LLE-0050 [COVID-19]), dated June
 12, 2020.
------------------------------------------------------------------------
       James A. FitzPatrick Nuclear Power Plant--Docket No. 50-333
------------------------------------------------------------------------
James A. FitzPatrick Nuclear Power Plant--        ML20153A381 (non-
 Request for Exemption from Certain 10 CFR Part    public, withheld
 73 Training Requirements Due to Coronavirus       under 10 CFR 2.390).
 2019 Public Health Emergency, dated May 29,
 2020.
James A. FitzPatrick Nuclear Power Plant,         ML20156A152 (non-
 Supplemental Information to Request for           public, withheld
 Exemption from Certain 10 CFR Part 73 Training    under 10 CFR 2.390).
 Requirements Due to Coronavirus 2019 Public
 Health Emergency, dated June 4, 2020.
James A. FitzPatrick Nuclear Power Plant--        ML20164A210.
 Exemption Request from Certain Requirements of
 10 CFR Part 73, Appendix B, ``General Criteria
 for Security Personnel'' (EPID L-2020-LLE-0094
 [COVID-19]), dated June 29, 2020.
------------------------------------------------------------------------
  McGuire Nuclear Station, Units 1 and 2--Docket Nos. 50-369 and 50-370
------------------------------------------------------------------------
McGuire Nuclear Station, Unit Nos. 1 and 2--      ML20156A411 (non-
 Request a Temporary Exemption from the            public, withheld
 Identified Security Training Requalification,     under 10 CFR 2.390).
 dated June 4, 2020.
McGuire Nuclear Station, Unit 1 and 2--Temporary  ML20159A002.
 Exemption from Certain Requirements of 10 CFR
 Part 73, Appendix B, ``General Criteria for
 Security Personnel,'' Section VI (EPID L-2020-
 LLE-0095 [COVID 19]), dated June 23, 2020.
------------------------------------------------------------------------
 Millstone Power Station, Unit Nos. 1, 2, and 3--Docket Nos. 50-245, 50-
                             336, and 50-423
------------------------------------------------------------------------
Millstone Power Station Units 1, 2, and 3--       ML20149K676 (non-
 Request for Exemption from Select Requirements    public, withheld
 of 10 CFR Part 73, Appendix B, Section VI,        under 10 CFR 2.390).
 dated May 28, 2020.
Millstone Power Station, Unit Nos. 1, 2, and 3--  ML20161A409.
 Exemption Request from Certain Requirements of
 10 CFR Part 73, Appendix B, ``General Criteria
 for Security Personnel,'' Section VI (EPID L-
 2020-LLE-0092 [COVID-19]), dated June 12, 2020.
------------------------------------------------------------------------
 North Anna Power Station, Unit Nos. 1 and 2--Docket Nos. 50-338 and 50-
                                   339
------------------------------------------------------------------------
North Anna Power Station Units 1 and 2, Request   ML20149K650 (non-
 for Exemption from Select Requirements of 10      public, withheld
 CFR Part 73, Appendix B, Section VI, dated May    under 10 CFR 2.390).
 28, 2020.
North Anna Power Station, Unit Nos. 1 and 2--     ML20150A292.
 Temporary Exemption from Certain Requirements
 of 10 CFR Part 73, Appendix B, ``General
 Criteria for Security Personnel,'' Section VI
 (EPID L-2020-LLE-0090 [COVID-19], dated June
 12, 2020.
------------------------------------------------------------------------
 Point Beach Nuclear Plant, Units 1 and 2--Docket Nos. 50-266 and 50-301
------------------------------------------------------------------------
Point Beach Nuclear Plant, Units 1 and 2--        ML20142A368 (non-
 Exemption Request for Security Training           public, withheld
 Requirements due to COVID-19 Pandemic, dated      under 10 CFR 2.390).
 May 21, 2020.
Point Beach Nuclear Plant, Units 1 and 2--        ML20153A011.
 Exemption Request from Certain Requirements of
 10 CFR Part 73, Appendix B, ``General Criteria
 for Security Personnel,'' Section VI (EPID L-
 2020-LLE-0081 to L-2020-LLE-0088 [COVID-19]),
 dated June 15, 2020.
------------------------------------------------------------------------
           R. E. Ginna Nuclear Power Plant--Docket No. 50-244
------------------------------------------------------------------------
R. E. Ginna Nuclear Power Plant--Request for      ML20161A147 (non-
 Exemption from Certain 10 CFR Part 73 Training    public, withheld
 Requirements Due to Coronavirus 2019 Public       under 10 CFR 2.390).
 Health Emergency, dated June 8, 2020.

[[Page 43885]]

 
R. E. Ginna Nuclear Power Plant--Exemption        ML20156A151.
 Request from Certain Requirements of 10 CFR
 Part 73, Appendix B, ``General Criteria for
 Security Personnel'' (EPID L-2020-LLE-0099
 [COVID-19]), dated June 24, 2020.
------------------------------------------------------------------------
    St. Lucie Plant, Unit Nos. 1 and 2--Docket No. 50-335 and 50-389
------------------------------------------------------------------------
St. Lucie Nuclear Plant, Units 1 and 2--          ML20142A479 (non-
 Exemption Request for Security Training           public, withheld
 Requirements due to COVID-19 Pandemic, dated      under 10 CFR 2.390).
 May 21, 2020.
St. Lucie Nuclear Plant, Units 1 and 2--          ML20155K712.
 Exemption Request from Certain Requirements of
 10 CFR Part 73, Appendix B, ``General Criteria
 for Security Personnel,'' Section VI (EPID L-
 2020-LLE-0077 [COVID-19]), dated June 9, 2020.
------------------------------------------------------------------------
             Seabrook Station, Unit No. 1--Docket No. 50-443
------------------------------------------------------------------------
Seabrook Station--Exemption Request for Security  ML20142A374 (non-
 Training Requirements due to COVID-19 Pandemic,   public, withheld
 dated May 21, 2020.                               under 10 CFR 2.390).
Seabrook Station--Supplement to SBK-L-20066,      ML20143A093 (non-
 Exemption Request for Security Training           public, withheld
 Requirements due to COVID-19 Pandemic, dated      under 10 CFR 2.390).
 May 22, 2020.
Seabrook Station, Unit No. 1--Exemption Request   ML20143A273.
 from Certain Requirements of 10 CFR Part 73,
 Appendix B, ``General Criteria for Security
 Personnel,'' Section VI (EPID L-2020-LLE-0069
 [COVID-19]), dated June 8, 2020.
------------------------------------------------------------------------
      Shearon Harris Nuclear Power Plant, Unit 1--Docket No. 50-400
------------------------------------------------------------------------
Shearon Harris Nuclear Power Plant, Unit 1--      ML20141L635 (non-
 Security Training Requalification Exemption       public, withheld
 Request, dated May 20, 2020.                      under 10 CFR 2.390).
Shearon Harris Nuclear Power Plant, Unit 1--      ML20142A185.
 Temporary Exemption from Certain Requirements
 of 10 CFR Part 73, Appendix B, ``General
 Criteria for Security Personnel,'' Section VI
 (EPID L-2020-LLE-0064 [COVID-19]), dated June
 9, 2020.
------------------------------------------------------------------------
    South Texas Project, Units 1 and 2--Docket Nos. 50-498 and 50-499
------------------------------------------------------------------------
South Texas Project, Units 1 and 2--Exemption     ML20142A520.
 Request due to COVID-19 Pandemic, dated May 21,
 2020.
South Texas Project, Units 1 and 2--Temporary     ML20155K679.
 Exemption from Certain Requirements of 10 CFR
 Part 73, Appendix B, ``General Criteria for
 Security Personnel,'' Section VI (EPID L-2020-
 LLE-0076 [COVID-19]), dated June 18, 2020.
------------------------------------------------------------------------
      Three Mile Island Nuclear Station, Unit 1--Docket No. 50-289
------------------------------------------------------------------------
Three Mile Island Nuclear Station, Unit 1,        ML20157A209 (non-
 Request for Temporary Exemption from Certain 10   public, withheld
 CFR Part 73 Training Requirements Due to          under 10 CFR 2.390).
 Coronavirus 2019 Public Health Emergency, dated
 June 5, 2020.
Three Mile Island Nuclear Station, Unit 1--       ML20161A391.
 Exemption Request from Certain Requirements of
 10 CFR Part 73, Appendix B, ``General Criteria
 for Security Personnel'' (EPID L-2020-LLE-0096
 [COVID-19]), dated June 30, 2020.
------------------------------------------------------------------------
  Turkey Point Nuclear Generating Unit Nos. 3 and 4--Docket Nos. 50-250
                               and 50-251
------------------------------------------------------------------------
Turkey Point Nuclear Plant, Units 3 and 4--       ML20142A273 (non-
 Exemption Request for Security Training           public, withheld
 Requirements due to COVID-19 Pandemic, dated      under 10 CFR 2.390).
 May 21, 2020.
Turkey Point Nuclear Point, Units 3 and 4--       ML20149K606.
 Issuance of Temporary Exemption Concerning
 Security Training Requirements (EPID L-2020-LLA-
 0067), dated June 15, 2020.
------------------------------------------------------------------------

    The NRC may post additional materials to the Federal rulemaking 
website at https://www.regulations.gov under Docket ID NRC-2020-0110. 
The Federal rulemaking website allows you to receive alerts when 
changes or additions occur in a docket folder. To subscribe: (1) 
Navigate to the docket folder (NRC-2020-0110); (2) click the ``Sign up 
for Email Alerts'' link; and (3) enter your email address and select 
how frequently you would like to receive emails (daily, weekly, or 
monthly).

    Dated: July 15, 2020.

    For the Nuclear Regulatory Commission.
James G. Danna,
Chief, Plant Licensing Branch I, Division of Operating Reactor 
Licensing, Office of Nuclear Reactor Regulation.